Parcul Național Domogled - Valea Cernei · Caraș-Severin
- Distance
- 7.1 km / 4.4 mi
- Elevation gain
- 155 m
- Typical duration
- 1 hr 42 min
- Panoramic viewpoint
- Waymarked route
We track 8 routes that match this search in Parcul Național Domogled - Valea Cernei. They average 8.7 km and 191 m (627 ft) of ascent.
That is 36 percent of the 22 routes we map in Parcul Național Domogled - Valea Cernei. They are shorter than the local average, 8.7 km against 11.7 km, which is what makes this a practical shortlist for a half day.
Moderate routes are the sweet spot for most regular walkers: enough climbing to feel like a proper day out, never enough to turn into an ordeal. These lean toward the demanding end, so plan for a full day and check the forecast before you commit.
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Gorj
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Caraș-Severin
Parcul Național Domogled - Valea Cernei · Caraș-Severin
The ten highest scoring routes on this page, so you can compare effort before opening any of them.
| Route | Distance | Ascent | Time | Difficulty | Best season |
|---|---|---|---|---|---|
| Băile Herculane (DN67D) în dreptul Hidrocentralei - Creasta Munților MehedințiParcul Național Domogled - Valea Cernei | 7.1 km | 155 m | 1 hr 42 min | Moderate | April to October |
| Băile Herculane (DN 67D) în dreptul crucii Ghizelei - Cheile ȚăsneiParcul Național Domogled - Valea Cernei | 8.4 km | 186 m | 2 hr 2 min | Moderate | April to October |
| Băile Herculane (DN67D) - Creasta Munților MehedințiParcul Național Domogled - Valea Cernei | 6.6 km | 146 m | 1 hr 36 min | Moderate | April to October |
| Băile Herculane (DN67D) în dreptul Hidrocentralei - Creasta Munților MehedințiParcul Național Domogled - Valea Cernei | 6.8 km | 149 m | 1 hr 38 min | Moderate | April to October |
| Cloșani - Baraj Valea MareParcul Național Domogled - Valea Cernei | 10.3 km | 227 m | 2 hr 29 min | Moderate | April to October |
| Motel Dumbrava (Km 18 DN67D) - Poiana Balta CerbuluiParcul Național Domogled - Valea Cernei | 9.6 km | 210 m | 2 hr 18 min | Moderate | April to October |
| Motel Dumbrava (Km 18 DN67D) - Puntea lui Stoian (km 19 DN67D)Parcul Național Domogled - Valea Cernei | 12.8 km | 281 m | 3 hr 5 min | Moderate | April to October |
| Motel Dumbrava (Km 18 DN67D) - Șaua PrislopParcul Național Domogled - Valea Cernei | 7.8 km | 172 m | 1 hr 53 min | Moderate | April to October |
If you only have time for one, start with Băile Herculane (DN67D) în dreptul Hidrocentralei - Creasta Munților Mehedinți, Motel Dumbrava (Km 18 DN67D) - Puntea lui Stoian (km 19 DN67D), Motel Dumbrava (Km 18 DN67D) - Poiana Balta Cerbului. Those are the routes people come back to. Every route on this page links through to a full guide with the map, elevation profile, seasonal advice and what to bring.
Other shortlists covering the same area or the same kind of terrain.